Renovation Update - New Nave Floors

21Jun

In the gallery below you will see the photo “New Nave floor from front” showing the final stage of staining and finishing the main floor. The chancel floor will be rebuilt next, using reclaimed wood from the old floor. Still undergoing restoration are two of the east windows, the “Choir Singer’s” window at left and the “St. John” window at the back. The pendant light fixtures have been restored and re-hung in new locations that do not conflict with the Nave crossties. 